Martin Stone Quarries, Inc
1355 N. Reading Ave.
Bechtelsville, PA 19505
Architect -Lee Architectural Associates
Cost Plus Fee $100,000
Building Use - Renovation of 1,700sq. ft, circa 1800, 2 story barn to warehouse storage facility
Completion -March 2008
Traditions of Hershey
100 N. Larkspur Drive
Palmyra, PA 17078
Architect - J. Randolph Parry Architects PC
Construction Management Contract w/GMP - $12,000,000
Building Use - 120,000 sq. ft., 3 story, 120 unit independent
senior living facility.
Completion -December 2007
Oakshire Mushroom Farms, Inc.
3285 Newark Road
Kennett Square, PA 19348
Architect - Lee Architectural Associates
Lump Sum Contract - $451,000
Building Use - 19,000 Sq ft. addition including a filtered purified room for mushroom spore processing plant
Completion - January 2008
Goodwest Industries
48 Quarry Road
Traprock Industrial Park
Douglassville, PA 19518
Architect - Lee Architectural Associates
Lump Sum Contract - $400,000
Building Use - 13,200 Sq. Ft. Pre-engineered metal building warehouse addition
Completion - August 2007
Perkiomenville Mennonite Church
1836 Gravel Pike (Route 29)
Perkiomenville, PA
Architect - Lee Architectural Associates
Construction Management Contract w/GMP - $1,700,000
Building Use - Multi-purpose/Fellowship/Offices/Classrooms/Library, etc.
Completion - July 2007
Flag Zone, LLC
105 Industrial Drive
Gilbertsville, PA 19525
Architect - Lee Architectural Associates
Lump Sum Contract - $1,000,000
Building Use - Renovation of 100,000 sq. ft. pre-engineered metal building
to include 7,500 Sq. Ft. Office area, installation of demising walls and air-conditioning
in production areas
Completion - June 2007
Martin Stone Quarries, Inc
1355 N. Reading Ave.
Bechtelsville, PA 19505
Architect - Lee Architectural Associates
Lump Sum Contract - $156,000
Building Use - 2,700 Sq. Ft. Pre-engineered metal building addition to house truck wash bay area.
Scheduled Completion - January 2007
Schaeffer Street Property, LLC
100 Schaeffer Street
Boyertown, PA 19512
Architect - Lee Architectural Associates
Lump Sum Contract - $154,000
Building Use - 2,200 Sq. Ft. tenant fit-out for Healthcare and Business office use..
Scheduled Completion - January 2007
Chestnut Knoll Assisted Living
120 West Fifth Street
Boyertown, PA 19512
Architect J. Randolph Parry Architects PC
Construction Management Contract - $ 500,000
Building Use - 4,000 sq. ft addition to the assisted living/dementia area consisting of apartments and activities areas.
Completion - November 2006
Ursinus College
785 E. Main Street
P.O. Box 1000
Collegeville, PA 19426-1000
Architect - Lee Architectural Associates
Construction Management Contract w/GMP - $ 600,000
Building Use - Renovation of Beardwood/Paisley/Stauffer Dormitory restroom facilities
Completion - August 2006
James Hardie Building Products
Excelsior Business Park
318 June Avenue
Blandon, Pa. 19510
Architect - Muhlenberg/Greene Architects
Construction Management Contract - $4,500,000
Building Use - 120,000 Sq. Ft. warehouse expansion. Pre-Engineered metal building.
Completion - June 2006
Fronheiser Pools
104 N. 7th Street
Bally, Pa 19503
Architect - Thomas J. Farmer
Cost plus fee Contract - $68,000
Building Use - Renovation of 2,000 Sq. Ft. warehouse to serve as administrative office and training center.
Completed - November 2006
Orefield Cold Storage
3824 Route 309
Orefield, PA 18069
Architect - N.C.S East, Inc.
Construction Management Contract Cost Plus- Approximately $ 1,700,000
Building Use - Pre-engineered metal building consisting of 67,000 SF -10° freezer along with 35,000 SF 35° refrigerated loading docks.
Completion - March 2006
Lebec Enterprises
Hollenbach Home Center
Rt 100 & County Line Road
Boyertown, PA 19512
Architect - Lee Architectural Associates
Cost Plus Fee
Building Use - Interior renovation of store & showroom area.
Completion - February 2006
St. Gabriel's Episcopal Church
1188 Benjamin Franklin Highway East
Douglassville, PA
Architect - Olsen/de Turck Architects
Construction Management Contract - $ 1,513,356
Building Use - 2 Story Sunday School/Day Care Center, 12,400 SF addition, plus 8,300 SF renovation
Completion - January 2006
Boyertown Area YMCA West
301 West Spring Street
Boyertown, PA 19512
Architect - Lee Architectural Associates
Lump Sum Contract - $ 151.397.00
Building Use - Complete renovation of main entrance and ADA improvements.
Completion - December 2005
Quakertown Community
School District - Freshman Center
349 South 9th Street
Quakertown, Pa. 18951
Architect - Diseroad, Wolff, Kelly, Clough, Bucher
Lump Sum Contract - $4,500,000
Building Use - 10,000 SF addition for the new cafeteria
and kitchen along with renovation work on existing school.
Completion - July 2005
Villa at Morlatton
1170 Benjamin Franklin Highway East
Douglassville, PA 19518
Architect - Olsen/deTurck Architects
Construction Management Contract - $8,113,151
Building Use - 101,000 SF, 3 story, independent living retirement
complex
Completion - June 2005
James Hardie
Building Products
Excelsior Business Park
318 June Avenue
Blandon, Pa. 19510
Architect - Lee Architectural Associates
Lump Sum Contract - $443,000
Building Use - Interior Renovation of 10,000 SF warehouse and employee
lunch and locker rooms.
Completion - May 2005
Rinox
Pavers, LLC
Lot #9 Trap Rock Business Center
Benjamin Franklin Highway West
Douglassville, Pa. 19518
Architect - Lee Architectural Associates
Lump Sum Contract - $1,100,000
Building Use - 31,500 SF Pre-engineered metal building to house new manufacturing
facility along with 3,500 SF conventional office spaces.
Completion - March 2005
Good West Industries
Lot #4 Trap Rock Business Center
Benjamin Franklin Highway West
Douglassville, Pa. 19518
Architect - Lee Architectural Associates
Lump Sum Contract - $855,000
Building Use - 21,600 SF, Pre-enginnered metal building, new
manufacturing facility.
Completion - March 2005 Saint Basil the Great Church
2340 Kimberton Road
Kimberton, PA
Architect/Engineer - Disroad, Wolfe, Kelly Clough & Bucher
Lump Sum Contract - $5,327,927
Building Use - 35,883 SF, 1,000 seat capacity, two story new church & support
services
Completion - January 2005
Camp Mensch Mill
Mensch Mill Road
Alburtis, PA
Architect - Synergetics
Construction Management Contract - $2,000,000 for first of multi-phase
project
Building Use - First phase will consist of a 48 bed adult center
with a dining room, a 100 person capacity pavilion complete with a bathroom
and shower facility, a seasonal camping area with elevated platforms
and various recreational areas.
Completion - September 2004
National Penn Bank - Crownpointe Branch
3201 Emrick Blvd.
Bethlehem, PA 18020
Architect/Engineer - Masano/Fries Architect, Inc.
Lump Sum Contract - $571,340
Building Use - 3000 SF bank branch office
Completion - August 2004
Schaeffer Street Offices
West Fifth and Schaeffer Street
Boyertown, Pa 19512
Architect - J. Randolph Parry Architects PC
Construction Management Contract w/GMP - $900,000
Building Use - 8500 SF professional/medical office space
Completion - July 2004
Berkshire Orthopedics
2201 Ridgewood Road
Wyomissing, Pa 19601
Lump Sum Contract - $100,273
Building Use - Renovation of office space into MRI medical suite
Completion - July 2004
Boyertown Area YMCA East
Route 663 and Dotterer Road
Gibertsville, Pa
Architect - Lee Architectural Associates
Construction Management Contract w/GMP - Approx./$2,000,000
Building Use - 18,400 sf gymnasium, wellness center, shower/locker facility,
offices and full day care center
Completion - April 2004
Drug Plastics & Glass Co., Inc
One Bottle Drive
Boyertown, Pa
Architect - Muhlenberg Green Architects
Construction Management Contract - $200,000
Building Use - Exterior renovations to office entryway
Completion - Spring 2004
Boyertown Area YMCA West
301 West Spring Street
Boyertown, PA 19512
Architect/Engineer - Lee Architectural Associates
Construction Management Contract w/ GMP - Approx/ $248,664
Building Use - Fitness Center, Wellness Center Addition
Completion - October 2003
Campbell Fittings,
Inc.
301 South Washington Street
Boyertown, PA
Architect/Engineer - Lee Architectural Associates
Lump Sum Contract - $248,679
Building Use - 10,000 SF pre-engineered steel warehouse
Completion - October 2003
Chestnut Knoll Assisted Living Facility
120 West Fifth Street
Boyertown, PA
Architect/Engineer - Lee Architectural Associates
Construction Management Contract w/ GMP - $348,000
Building Use - Addition consisting of 4 assisted living apartments
Completion - December 2003
Emmaus
High School - Field House
Cedar Crest Blvd & Pine Street
Emmaus, PA
Architect/Engineer - Liberty Engineering
Lump Sum Contract - $478,700
Building Use - 5,400 SF team rooms, training room, athletic equipment
storage
Completion - September 2003
Asbury United Methodist
Church
1533 Springhouse Road
Allentown, PA
Architect/Engineer - Spillman Farmer Architects
Lump Sum Contract - $2,358,706
Building Use - 15,900 SF addition for multi-purpose room and classroom
space along with renovations to chancel area
Completion - August 2003
Brittany Pointe Estates
1001 Valley Forge Road
Landsdale, PA
Lump Sum Contract - $36,000
Building Use - Expansion to double the existing wood shop of the
Independent Living Unit
Completion - August 2003
Halteman Real Estate
1808 Swamp Pike
Gilbertsville, PA
Architect/Engineer - Lee Architectural Associates
Lump Sum Contract - $350,000
Building Use - 5,400 SF professional office space
Completion - June 2003
Salem United Church
of Christ
Covered Bridge Road
Oley, PA
Architect/Engineer - Thomas J. Farmer
Lump Sum Contract - $607,000
Building Use - 7,300 SF wood frame, brick veneer classroom addition
to historic church, with new elevator serving three levels
Completion - June 2003
Growing Dreams Child
Development Center
144 Holly Road
Boyertown, PA
Architect/Engineer - Lee Architectural Associates
Lump Sum Contract - $400,000
Building Use - Renovation of 11,000 SF of office space for expansion
of child day care center
Completion - May 2003
Commonwealth Orthopaedic
Associations
11 Fairlane Road
Reading, PA
Architect/Engineer - Lee Architectural Associations
Lump Sum Contract - $106,000
Building Use - Conversion of existing medical facility into new
open MRI suite
Completion - May 2003
Colmar Imaging MRI
Center
182 Bethlehem Pike
Colmar, PA
Lump Sum Contract - $133,600
Building Use - Conversion of existing MRI facility into new open
MRI suite.
Completion - March 2003
Hope Community Church
2732 N. Charlotte St.
Gilbertsville, PA 19525
Architect - Lee Architectural Associates
Construction Management Contract w/GMP - $1,500,000
Building Use - 29,000 SF one story building to include a multi-purpose
room, classroom space and a kitchen facility.
Completion - January 2003
Fleetwood Industries, Inc.
3001 St. Lawrence Avenue
Reading, PA
Architect - J. Randolph Parry Architects
P.C.
Construction Management Contract -
$1,946,000
Building Use - 52,000 SF addition for
warehouse and manufacturing operations. Tilt-up concrete construction.
Completion - December, 2002
Pennsylvania State University
Franco Building Addition
Berks Campus
Reading, PA
Architect - Atkin Olshin Lawson Bell Architects
Lump Sum Contract - $1,963,000
Building Use - One story 10,000 SF addition to include three classrooms
and faculty office spaces.
Completion - December 2002
Northern Lehigh Middle School
600 North Diamond Street
Slatington, PA
Architect - The Architectural Studio
Lump Sum Contract - $2,447,700
Building Use - 73,000 SF renovation of classrooms, cafeteria,
gymnasium, auditorium and administrative offices along with 3,200 SF addition
of group instructional area and greenhouse.
Completion - October, 2002
Pottsville Open MRI
Route 61
Pottsville, PA
Architect - Lee Architectural Associates
Lump Sum Contract - $137,000
Building Use - Conversion of an existing 2,200 SF medical lab
into a new open MRI suite, including administrative offices, reception
and support facilities.
Completion - December, 2002
Better
Materials Corporation
2200 Second Street Pike
Penns Park, PA
Architect -
Lee Architectural Associates
Lump Sum Contract - $596,043
Building Use - 17,100
SF pre-engineered metal building. Will house an equipment and vehicle
maintenance facility.
Completion - September,
2002
Souderton Area School District
West Broad Street Elementary School
342 West Broad Street
Souderton, PA
Architect - Diseroad, Wolff, Kelly, Clough, Bucher, Inc.
Lump Sum Contract - $1,800,000
Building Use - 8954 SF gymnasium/multi-purpose addition and renovation
of cafeteria area along with playground reconstruction.
Completion - July 2002
Berks Family Care
Old Swede Road
Douglassville, PA
Architect - Spearman Associates, Ltd.
Construction Management Contract - $810,603
Building Use - 7,872 SF medical facility and administrative
office complex.
Completion - June 2002
Morning Star Fellowship Church
100 Limekiln Road
Bechtelsville, PA
Lump Sum Contract - $727,024
Building Use - 11,500 SF pre-engineered building addition to existing
church, to serve as youth classrooms and recreational space.
Completion - June 2002
Royer Quality Castings
380 South Reading Avenue
Boyertown, PA 19512
Architect - Lee Architectural Associates
Lump Sum Contract - $177,300
Building Use - 6,500 pre-engineered metal building warehouse facility.
Completion - June 2002
Halteman Chiropractic
Center
1804 Swamp Pike
Gilbertsville, PA
Architect - Edgar T. Chatman-Royce
Lump Sum Contract - $785,984
Building Use - 4000 SF chiropractic office facility, with 2,000
SF additional tenant office space.
Completion - May 2002
Fleetwood Industries
3001 St. Lawrence Avenue
Reading, PA 19606
Architect - Lee Architectural Associates
Time & Material Contract - $465,000
Building Use - 9,300 SF pre-engineered metal building warehouse
addition.
Completion - April 2002
Northampton Township Municipal Park
Hatboro & New Roads
Richboro, PA
Engineer - CKS Engineers, Inc.
Lump Sum Contract - $647,000
Building Use - Municipal park improvements which include a hexagon
shaped picnic pavilion with kitchen and bath facilities. 2,300 SF park
maintenance building.
Completion - March, 2002
Drug Plastics
& Glass Co., Inc.
One Bottle Drive
Boyertown, PA
Architect - Muhlenberg/Greene
Architects
Construction Management Contract w/GMP - $2,000,000
Building Use - 20,000 SF two story office administration addition
including demolition of 10,000 SF of warehouse space. The site also consists
of a 48 space parking area, sidewalk, lighting and landscape improvements.
Completion - September 2001
Quality Systems, Inc.
256 E. Benjamin Franklin Highway
Birdsboro, PA
Architect - Lee Architectural Associates
Construction Management Contract - $150,000
Building Use - Renovation of Circa 1800 barn and ceramic tiled
silos to include 5,500 SF of office administrative space. The building
includes exterior stucco with exposed original brownstone along with a
metal standing seam roof.
Scheduled Completion - September, 2001
Bally Mennonite Church
1481 Route 100
Bally, PA
Architect - Lee Architectural Associates
Construction Management contract - $939,000
Building Use - 13,500 SF masonry with wood roof trusses, bar joist
deck and EPDM roofing. Will house office administration and fellowship
hall.
Completion - July 2001
Harris Bros. Buick
Olds
851 South West End Blvd.
Quakertown, PA
Architect - Irwin J. Bass
Construction Management contract - $1,400,000
Building Use - New 14,500 SF auto dealership with showroom, sales,
parts, service and office administration space. The building structure
is low bearing masonry walls with structural steel and bar joists.
Completion - June 2001
Boyertown Medical Services
23 North Walnut Street
Boyertown, PA 19512
Architect - Architectural Solution, Inc.
Lump Sum Contract - $189,000
Building Use - Tenant fitout 5,000 SF expansion of existing
rehabilitation and medical testing facility.
Completion - April 2001
St. Columbkill Church
200 Indian Spring Road
Boyertown, PA
Architect - Form Space Design
Contract Amount - $1,688,000
Building Use - 11,000 SF sanctuary addition with 700 seat capacity.
The building is a structural steel frame with brick veneer exterior.
Completion - April 2001
Amity Rental
5 Maple Drive
Douglassville, PA
Architect - Lee Architectural Associates
Design Building Contract - $579,000
Building Use - New 11,000 SF pre-engineered metal building to house
tool and equipment rental center and office space.
Completion - March 2001
Videotek
Inc.
243 Shoemaker Rd
Pottstown, PA
Architect - Nave, Newell, StampIfl. LTD
Construction Management Contract w/GMP- $1,400,000
Building Use - Two Story 13,800 SF engineering office
addition. The building consists of structural steel frame with
masonry veneer exterior.
Completion - February 2001 Salvation
Army
409 South Reading Avenue
Boyertown, PA
Architect - Lester Rosenwinkle
Contract Amount - $704,400
Building Use - Interior and exterior renovation of 8,500 existing
building to house community recreation center, chapel and office space
Completion - November 2000 Bally
Ribbon Mills
23 N. Seventh Street
Bally, PA
Architect - S. J. Elton Architects
Construction Management Contract - $272,240
Building Use - 7,125 SF pre-engineered metal building warehouse
addition.
Completion - November 2000
Chestnut Knoll Assisted Living Facility
120 West Fifth Street
Boyertown, PA
Architect - J. Randolph Parry Architects, P.C.
Construction Management Contract w/GMP - $4,250,000
Building Use - A three story assisted living facility housing 60 beds (30,000 SF) with a connecting link housing administration, kitchen and dining facilities leading to the one story special needs area with 40 beds (20,000 SF).
Completion - September 2000
Faulkner Ford Mercury
321 South West End Boulevard
Route 309
Quakertown, PA
Architect - Irwin J. Bass, Architect
Construction Management Contract w/GMP - $900,000
Building Use - Renovation of automobile dealership for showroom, sales, new car delivery area and office administration.
Completion - September 2000
Belle Haven Nursing Home
1320 Mill Road
Quakertown, PA
Architect - Lee Architectural Associates
Construction Management Contract - Cost of the Work Plus a Fee
Building Use - Interior and exterior renovations to the skilled nursing facility.
Completion - June 2000 St. Luke's Quakertown Hospital-Medical Office Building
1021 Park Avenue
Quakertown, PA
Designed by Collins/Reisenbichler Architects, Inc., El Paso, TX
Owners Representative - Mediplex Medical Building Corporation
Contract Sum - $4,402,000
Building Use - A three story, 30,000 SF medical office building with a connection link to the existing hospital, creating a new main lobby entrance and a patient drop-off area with a canopy. The building is a structural steel frame with brick veneer.
Completion - March 2000
Rollins Leasing Corporation
Hoover Avenue
Lehigh County, PA
Architect - Lee Architectural Associates
Design-Build Contract - $2,000,000
Building Use - A one story, 13,570 SF truck maintenance and office administration facility. The site consists of a fuel island, 120 tractor trailer parking bays w/electric heaters and 64 vehicle parking spaces.
Completion - February 2000
Southampton Fire Company
Street Road
Southampton, PA
Thomas L. Zeigler, PE, Inc., Registered Professional Engineer
Construction Management Contract - Cost Plus a Fee w/GMP ($1,900,000)
Building Use - Addition and renovations. Interior renovations to the banquet hall and kitchen area. New additions to accommodate offices, meeting/training rooms, apparatus room, tool room, bunk room and new toilet facilities. The exterior façade consists of brick veneer, split-face block and EIFS.
Completion - January 2000
West Grove United Methodist Church
West Grove, PA
Designed by - Bernardin & Associates
Contract Amount - $1,043,000.00
Building Use - New 12,000 SF facility with a central fellowship/sanctuary area, kitchen, classroom wing and an administrative wing.
Completion - December 1999
Master Water Conditioning Corporation
224 Shoemaker Road
Pottstown, PA
Designed by - Lee Architectural Associates
Construction Management Contract - Cost Plus a Fee w/GMP ($414,000)
Building Use - A one story, 10,800 SF warehouse addition with extensive interior modifications for new offices and second level storage mezzanine.
Completion - August 1999
Boyertown Jr. High School West Center
200 South Madison Street
Boyertown, PA
Designed by - Diseroad Wolff Kelly Clough Bucher, Inc.
Contract Amount.....$2,697,170.00
Building Use- Interior renovations and one story additions for classrooms, cafeteria/kitchen and auxilary gymnasium.
Completed - April 1999
Diamond Credit Union
High Street
Pottstown, PA
Designed by - Pressler, Finn, Bode
Contract Amount.....$1,117,372.00
Building Use- Three story addition for offices, new three bay drive-up service, and expanded parking facilities with renovation of existing building.
Completed - July 1999
Ursinus College
Collegeville, PA
Designed by - KSS Architects
Contract Amount.....$1,000,000.00
Building Use- Two story bookstore addition to Wismer Hall w/ mailroom, student lounge and new elevator.
Completion - February 1999
Faulkner-Ciocca Ford
Route 309
Quakertown, PA
Designed by - Irwin J. Bass Architects
Construction Management Contract.....Cost Plus a Fee w/ a GMP-$1,400,000.00
Building Use- 37 Bay Service Center-30,000 sf Renovation/Addition of existing building housing administrative offices, parts department, customer lounge, service advisor area with drive-in access to advisor area through automatic sensor operated overhead doors.
Completion - December 1998 Orefield Cold Storage
Route 309
Orefield, PA
Designed by - Adams Associates
Cost of the Work plus a Fee: $1,021,000.00
Building Use - Cold Storage Warehouse, loading docks and new office space
Completion - June 1998
Can Corporation of America
Excellsior Industrial Park
Blandon, PA
Designed by - Adams Associates and Steve Elton Architect
Contract Amount.....$612,740.00
Building Use - Manufacturing Warehouse addition
Completion - June 1998
PP&L (Pennsylvania Power & Light)
Human Resource Training Center
Walbert Avenue
Allentown, PA
Designed by - Fedetz & Martin Associates, P.C.
Contract Amount.....$508,950.00
Building Use- Renovation of existing service bay area for new offices (demolition of existing roof & walls to accommodate new roof and wall height), renovation of existing office area and new entrance addition
Completion - May 1998
First Savings Bank of Perkasie-Bedminster Branch Bank
Route 611 & Deep Run Road
Bedminster, PA
Designed by - Raphael Syphers Architects
Construction Management Contract w/ GMP.....$590,662.00
Building Use - New Branch Bank Facility
Completion - January 1998
Sanatoga Village Shopping Center
2190 East High Street
Pottstown, PA
Designed by - Lee Architectural Associates
Construction Management Contract.....$3,935,000.00 GMP
Building Use- Shopping Center project consisting of complete sitework, Thriftway Supermarket (40,000 sf), Hollywood Video and 6000 SF of additional retail space.
Completion - December 1997
Fred Beans Saturn of Devon
Route 30
Devon, PA
Designed by - Irwin J. Bass, Architects
Construction Management Contract: Cost of the Work w/ Fixed Fee.....$1,049,230.00
Building Use- Total interior & exterior renovation of existing car dealership for a new Saturn facility plus major sitework
Completion - December 1997 Waste Management of Indian Valley
Progress Drive
Telford, PA
Designed by - STV, Inc.
Contract Amount.....$881,740.00
Building Use - New Maintenance & Training Facility
Completion - December 1997 Boyertown Retirement Residence (Walnut Woods)
Walnut & Fifth Streets
Boyertown, PA
Designed by - Larsen & Ludwig, Inc., Pittsburgh, PA
Contract Amount.....$5,496,600.00
Building Use: 112 Unit Independent Living Facility, three stories, 105,000 sf, w/ a full service kitchen and dining facilities.
Completion - November 1997
Boyertown Medical Building
Walnut Street
Boyertown, PA
Designed by - Mulenburg/Greene Architects, LTD.
Construction Management Contract w/ GMP.....$1,101,000.00
Building Use - Professional Medical Office Facility, 12,000 SF
Completion - September 1997
St. Michael's Evangelical Lutheran Church
East Doe Run Road
Unionville, PA
Designed by - Ledarach Associates
Contruction Management Contract w/ GMP.....$1,053,832.00
Building Use - New Sanctuary, Narthex, Classrooms, Library,
Nursery, Offices
Completion - August 1997
Manor HealthCare Corp.
2021 Westgate Drive
Bethlehem, PA
Designed by - Treby Howard Philips
Contract Amount.....$558,115.00
Building Use - 15 bed, One story skilled nursing addition & renovation of exitsting Dining facilities.
Completion - May 1997
Waste Management of Indian Valley
Progress Drive
Telford, PA
Designed by - STV, Inc.
Contract Amount.....$731,650.00
Building Use - Sitework for office & maintenance facilities
Completion - May 1997 The Shops of Harleysville-Clemens Market & Seven Strip Stores
Routes 63 & 113
Harleysville, PA
Designed by - Cathers Associates
Construction Management w/ GMP.....$3,518,224.00
Total Shopping Center Construction Costs....$8,700,000.00 (includes Wal-Mart & site)
Building Use - Supermarket & Retail shops
Completion - March 1997 Leader Nursing Home-Laureldale Facility
Laureldale, PA
Designed by - Architecture, Inc.
Contract Amount.....$1,472,635.00
Building Use - 30 bed, Two story skilled nursing addition including physical therapy
Completion - March 1997
Fronheiser Pools
Route 100 North
Bally, PA 19503
Designed by - Spillman, Farmer, Shoemaker, Pell, Whildin PC.
Contract Amount ..... $997,075.00
Building Use - Sales Office/Showroom, Warehouse and Redner=s Mini-Market
Completed - October 1996 First Savings Bank of Perkasie
Route 663
Quakertown, PA
Designed by - Raphael Syphers Architects
Contract Amount.....$581,250.00
Building Use - Branch Bank
Completed - September 1996
Reading Crane & Engineering Co.
Lincoln Corporate Center, Exeter Township, PA
Designed by - Meister Architects
Contruction Management - GMP.....$726,000.00
Building Use - Office/Manufacturing Facility, 12,000 SF
Completed - August 1996
Pennswood Village Retirement Community
Route 413
Newtown, PA 18940
Designed by - Lewis & Rodgers Architects
Contract Amount.....$1,558,000.00
Building Use - 15 Bed Private Skilled Care Rooms with support facilities
Completed - July 1996
State Farm Insurance Service Center
Route 152
Sellersville, PA
Designed by - Michael Lux, Architect
Contract Amount.....$1,227,000.00
Building Use - New 17,000 SF Office Facility
Completion - June 1996 Wal-Mart Stores, Inc.
Harleysville, PA
Designed by - Dennis C. Woody, Architect of Record
Contract Amount.....$2,126,400.00
Building Use - Retail Store, 93,000 SF
Completion - May 1996 Harleysville Shopping Center Sitework (The Shops of Harleysville)
Route 63 & 113
Harleysville, PA
Designed by - Stout, Tacconelli & Associates, Inc.
Construction Management - GMP.....$2,930,392.00
Project Sitework - Future Supermarket and Retail Shoppes
Completion - May 1996
Leader Nursing Home-Lansdale Facility
Route 309
Montgomerville, PA
Designed by - Treby Howard Architects
Contract Amount.....$530,000.00
Building Use - 30 bed skilled nursing addition
Completed - April 1996
Goddard Early Learning Center
East High Street & First Avenue
Pottstown, PA 19464
Designed by - J & L Associates
Contract Amount ..... $512,000.00
Building Use - Child Day Care
Completed - November 1995
U.S. Axle, Inc.
275 Shoemaker Road
Pottstown, PA 19464
Designed by - Adams Associates
Contract Amount ..... $617,520.00
Building Use - Office/Manufacturing
Completed - September 1995
Allentown Refrigerated Terminals
Seneca Trail Road
Boyertown, PA 19512
Designed by - Adams Associates
Construction Management .....$600,000.00 GMP
Building Use - Freezer Reconstruction/Refrigerated Loading Docks
Completed - June 1995
Campbell Manufacturing
Spring & Railroad Streets
Bechtelsville, PA 19505
Designed by - Adams Associates S. J. Elton, Architect, AIA
Contract Amount ..... $1,150,590.00
Building Use - Manufacturing/Warehouse/Offices
Completed - March 1995 The Church of Jesus Christ of the Latter Day Saints
Sunrise Drive
Stroudsburg, PA 18360
Design by - Mulenburg/Greene Architects, Ltd.
Contract Amount ..... $535,830.00
Building Use - Worship Sanctuary, interior renovations and minor sitework
Completed - January 1995
Can Corporation of America
Excelsior Industrial Park
Blandon, PA 19510
Designed by - Adams Associates S. J. Elton, Architect, AIA
Contract Amount ..... $1,671,220.00
Building Use - Warehouse/Distribution Center
Completed - December 1994
Zohlman Nursing Home
108 South Main Street
Richlandtown, PA 18955
Design by - Diseroad & Wolff, Inc.
Contract Amount ..... $1,346,560.00
Building Use - 22 Bed Alzheimer Wing/Lounge/Nurses Station/Exterior Courtyard
Completed - October 1994
Furniture Unlimited, Inc.
125 Penn-Am Drive
Quakertown, PA 18951
Design by - Adams Associates
Contract Amount ..... $555,819.00
Building Use - Distribution Center
Completed - August 1994
Leader Nursing & Rehabilitation Center
600 W. Valley Forge Road
King of Prussia, PA 19406
Design by - Treby Howard Philips
Contract Amount ..... $853,070.00
Building Use - 31 Bed SNF Addition & Renovation
Completed - June 1994 St. John's Evangelical Lutheran Church
Church Road and Sleepy Hollow Road
Spinnerstown, PA 18968
Design by - Robert A. Bosak and Associates
Contract Amount ..... $637,000.00
Building Use - Classrooms/Multi-purpose room/Offices/Kitchen
Completed - December 1993 The Community YMCA of Eastern Delaware County
900 South Avenue
Secane, Ridley Township, Delaware County, PA
Design by - Architectural Alliance
Contract Amount ..... $1,690,000.00
Building Use - Indoor Pool/Gymnasium/Day Care/Administration Offices
Completed - November 1993
Browning-Ferris, Inc.
372 S. Henderson Road
King of Prussia, PA 19406
Design by - Frank Adams Associates
Contract Amount ..... $1,335,165.00
Building Use - Recycle Center
Completed - August 1993 Bombay Company
Ironstone Corporate Centre
105 Industrial Drive
Boyertown, PA 19512
Contract Amount ..... $2,400,000.00
Building Use - Distribution Center
Completed - June 1993
St. Luke Knolls, Inc.
45 Wilson Avenue
Gilbertsville, PA 19525
Design by - Reichert-Facilides Assoc.
Contract Amount ..... $1,698,724.00
Building Use - Housing Development for the Elderly
Completed - December 1992
Browning-Ferris, Inc.
Reliance Road
Hilltown Township, PA
Design by - Del Ciotto Associates
Contract Amount ..... $2,294,888.00
Building Use - Administrative Office/Truck Maintenance
Completed - April 1992
Orefield Cold Storage & Distribution Center
Route 309 North
Orefield, PA 18069
Contract Amount ..... $1,000,000.00
Building Use - Cold Storage Warehouse
Completed - April 1992
Spanco, Inc.
Hemlock Road
Morgantown, PA
Developer - Eagleview Commercial Const. Company
Contract Amount ..... $600,000.00
Building Use - Warehouse
Completed - February 1992
Boyertown Area YMCA
301 West Spring Street
Boyertown, PA 19512
Design by - Spillman Farmer Architects
Constuction Management Contract ..... $1,714,000.00
Building Use - Indoor Swimming Pool/Health Club
Completed - January 1992
Deltronic Labs, Inc.
Liberty Lane
New Britain Business Park
Design by - Richard Kapusta & Company
Contract Amount ..... $657,800.00
Building Use - Office and Manufacturing
Completed - May 1991
St. Columbkill Church
130 Indian Spring Road
Boyertown, PA 19512
Design by - Form Space Design
Contract Amount ..... $1,247,946.00
Building Use - Church Addition
Completed - December 1990
L.B.M. Office Environments
Routes 309 and 463
Montgomeryville, PA 18936
Design - by Kenneth F. Hockman
Contract Amount ..... $633,000.00
Building Use - Warehouse
Completed - November 1990
Integrated Industries, Inc.
Clover Mill Business Park
Exton, PA 19341
Architect - Integrated Industries
Contract Amount ..... $710,500.00
Building Use - Industrial Flex
Completed - November 1989
Bombay Company
Industrial Drive
Gilbertsville, PA 19525
Contract Amount ..... $2,490,000.00
Building Use - Warehouse
Completed - August 1989
Cooper Industries, Wagner Division
Second and Jefferson Streets
Boyertown, PA 19512
Contract Amount ..... $3,200,000.00
Building Use - Manufacturing and Warehouse
Completed - June 1989
Manatawny Manor
Old Schuylkill Road
Pottstown, PA 19464
Architect - Wirt Vitabile Associates
Contract Amount ..... $569,000.00
Building Use - Nursing Home Addition
Completed - May 1989 Pleasant Grove
Fairgrounds Road
Hatfield, PA 19440
Architect - Gerald F. Schwam Associates
Contract Amount ..... $1,230,830.00
Building Use - Elderly Housing Apartments
Completed - September 1988 |






















































|